Lots of highways and transport passage through the Kerch Strait to be built by 2019, included in the highway federal public M25 (A290). This is stated in the Government Decree of April 28, 2015 №412, which was signed by Russian Prime Minister Dmitry Medvedev.
See also
The transport passage through the Kerch Strait will connect the peninsula of Crimea to the Russian mainland. It will include including entrances from the road to the transport passage through the Kerch Strait, the transition itself, and part of the road from it to the city of Kerch, as well as road entrances to seaports Caucasus and Taman.
Recall In February 2015 LLC “SGM” Arkady Rotenberg and Rosavtodor signed a contract for design and construction of transport passage through the Kerch Strait worth 228.3 billion rubles. View the traffic on the bridge in a technical mode through the Kerch Strait scheduled for December 2018. In the summer of 2019 of the bridge will be available for all motorists.
As previously reported “RG”, the builders have erected a technological bridge for delivery of materials and transfer utilities from the Taman shore of the island of Tuzla. In parallel, in accordance with the state contract the project documentation of transport approaches to the bridge from the Krasnodar Territory is directed GlavGosExpertisa. 19-kilometer bridge across the Kerch Strait will be built in parallel with the construction of transport and railway approaches to it.
Found a mistake? Select the text with error, and press Ctrl + Enter , to tell us about it.
No comments:
Post a Comment