«Oil of Russia», 20.04.16, Moscow, 23:59
Preparing for drilling on the continental shelf of the Okhotsk Sea is in line with agreed plans of “Rosneft” and Statoil, said the press service of the Russian company on the results of the meeting of heads of companies.
“Chairman of the Board of” Rosneft “Igor Sechin held talks with the president, general manager of Statoil ASA Eldar Setre . The sides discussed the implementation of joint projects, including the preparation for drilling on the shelf of the sea of Okhotsk, “- said in a release
.” Igor Sechin and Eldar Setre noted that the cooperation between the companies is developing in strict compliance with agreed plans “, – the report says
in September of 2015.” Rosneft “reported that the joint venture” Rosneft “and Statoil” Magadanmorneftegaz “and” Lisyanskmorneftegaz “signed an agreement with the Chinese COSL for drilling two exploration wells in 2016. The wells will be drilled in areas “Magadan-1″ and “Lisyansky” in the Sea of Okhotsk.
“Rosneft” and Statoil in 2012 signed a cooperation agreement, under which is provided jointly develop Russian shelf and the participation of “Rosneft” in the development of the Norwegian continental shelf areas. Under the agreement, joint venture companies, the complex of geological exploration works were created, including 2D and 3D seismic work conducted geotechnical investigations.
Well the section “Magadan-1″ will be located at a distance of more than 100 kilometers from the coast. The distance from the shore to well within the site “Lisyansky” is about 90 kilometers. The Sea of Okhotsk is located south of the border of the Arctic zone, the sea depth in both drilling areas -. Less than 150 meters Read more on http://www.oilru.com/news/512712 /
No comments:
Post a Comment